Focus on daylight and openness 

This project was an expansion of 1,680 square meters of Dansk Retursystem’s existing office building. DS Flexhal has constructed Dansk Retursystem 2, the second phase of Dansk Retursystem's factory building. 

In the first phase of construction, five halls and an administration building totalling 13,500 square meters were built. 

The administration building, covering 1,865 square meters, was expanded in the second phase with a new extension adjoining the existing administration building, maintaining the same facade expression. 

Brand-enhancing facade cladding 

The facade is composed of lightweight sandwich panels. The steel panels feature a matte grey colour, along with a green hue identical to Dansk Retursystem's logo colour. 

The office expansion spans three floors, totalling 1,608 square meters, and, like the remaining part of the construction, stands at a height of 12 meters. 

The second floor is utilised for service and testing of deposit machines, archive space, and as a technical room. 

  • ProjectAdministration building
  • Construction periodFebruar-December 2021
  • EngineerDS Flexhal
  • DeveloperDansk Retursystem A/S
  • ArchitectDS Flexhal
  • Turnkey contractorDS Flexhal
  • Developed area1.680 m2

Dansk Retursystem A/S
Erik Husfeldts Vej 1,
2630 Taastrup

Contact

Paula Meyer
Head of Administration Buildings  
Scandinavia 


pam@ds-flexhal.dk
+45 60 20 39 04

We use cookies to optimize your experience of our website, for statistics and for marketing use.


Reject all cookies Accept necessary cookies Accept all cookies